In the summer 2016 Oscon installed a new area elastic sports floor in Hedehus Sports Hall, Denmark, totally 1,000 m2.  Here, a solution with KTL solid Hevea parquet boards was chosen, installed on the PRO III batten system as renovation. The elastic shock pads with build-in deformation control ensure maximum loading capacity and long term durability, as the batten elasticity is maintained over time.